Loan Programs Office
Current Totals
Loans: $34.4B
Jobs: ~60,000
| 1703 | ||
|---|---|---|
| AREVA | Front-end Nuclear | |
Front-end Nuclear |
Idaho Falls, ID | |
| $2 billion Loan Amount | 310/1,000 Jobs (Permanent / Construction) | N/A Generation Capacity |
| N/A MWh/Gallons | N/A Annual Avoided CO2(tons) | N/A Annual Cars off the Road* |
| N/A Annual Households Equivalent | ||
| 1703 | ||
|---|---|---|
| Georgia Power Company | Nuclear Generation | |
Nuclear Generation |
Waynesboro, GA | |
| $8.33 billion Loan Amount | 800/3,500 Jobs (Permanent / Construction) | 2,200 Generation Capacity |
| 17,152,000 MWh/Gallons | 9,932,000 Annual Avoided CO2(tons) | 2,122,000 Annual Cars off the Road* |
| 1,520,000 Annual Households Equivalent | ||
| 1705 | ||
|---|---|---|
| 1366 Technologies, Inc. | Solar Manufacturing | |
Solar Manufacturing |
Lexington, MA | |
| $150 million Loan Amount | 70/50 Jobs (Permanent / Construction) | 1,000 Generation Capacity |
| 1,927,000 MWh/Gallons | 1,116,000 Annual Avoided CO2(tons) | 238,000 Annual Cars off the Road* |
| 170,800 Annual Households Equivalent | ||
| 1705 | ||
|---|---|---|
| Abengoa Bioenergy Biomass of Kansas LLC | Biofuel | |
Biofuel |
Hugoton, KS | |
| $132.4 million Loan Amount | 65/300 Jobs (Permanent / Construction) | N/A Generation Capacity |
| N/A MWh/Gallons | 132,000 Annual Avoided CO2(tons) | 25,385 Annual Cars off the Road* |
| N/A Annual Households Equivalent | ||
| 1705 | ||
|---|---|---|
| Abengoa Solar, Inc. (Mojave Solar) | Solar Generation | |
Solar Generation |
San Bernardino County, CA | |
| $1.2 billion Loan Amount | 70/830 Jobs (Permanent / Construction) | 250 Generation Capacity |
| 679,000 MWh/Gallons | 393,000 Annual Avoided CO2(tons) | 84,000 Annual Cars off the Road* |
| 60,200 Annual Households Equivalent | ||
| 1705 | ||
|---|---|---|
| Abengoa Solar, Inc. (Solana) | Solar Generation | |
Solar Generation |
Gila Bend, AZ | |
| $1.446 billion Loan Amount | 60/1,700 Jobs (Permanent / Construction) | 250 Generation Capacity |
| 1,095,000 MWh/Gallons | 634,000 Annual Avoided CO2(tons) | 135,000 Annual Cars off the Road* |
| 97,100 Annual Households Equivalent | ||
| 1705 | ||
|---|---|---|
| Abound Solar | Solar Manufacturing | |
Solar Manufacturing |
Longmont, CO and Tipton, IN | |
| $400 million Loan Amount | N/A/400 Jobs (Permanent / Construction) | N/A Generation Capacity |
| 1,619,000 MWh/Gallons | 1,100,000 Annual Avoided CO2(tons) | 210,000 Annual Cars off the Road* |
| 166,000 Annual Households Equivalent | ||
| 1705 | ||
|---|---|---|
| Abound Solar | Solar Manufacturing | |
Solar Manufacturing |
Tipton, IN | |
| $400 million Loan Amount | N/A/400 Jobs (Permanent / Construction) | N/A Generation Capacity |
| 1,619,000 MWh/Gallons | 1,100,000 Annual Avoided CO2(tons) | 210,000 Annual Cars off the Road* |
| 166,000 Annual Households Equivalent | ||
| 1705 (FIPP) | ||
|---|---|---|
| Caithness Shepherds Flat | Wind Generation | |
Wind Generation |
Gilliam, Morrow Counties, OR | |
| $1.3 billion Loan Amount | 35/400 Jobs (Permanent / Construction) | 845 Generation Capacity |
| 1,800,000 MWh/Gallons | 1,042,000 Annual Avoided CO2(tons) | 223,000 Annual Cars off the Road* |
| 160,000 Annual Households Equivalent | ||
| 1705 | ||
|---|---|---|
| Cogentrix of Alamosa, LLC | Solar Generation | |
Solar Generation |
Alamosa, CO | |
| $90 milion Loan Amount | 10/75 Jobs (Permanent / Construction) | 30 Generation Capacity |
| 58,000 MWh/Gallons | 34,000 Annual Avoided CO2(tons) | 7,000 Annual Cars off the Road* |
| 5,100 Annual Households Equivalent | ||
| 1705 | ||
|---|---|---|
| Exelon (Antelope Valley Solar Ranch) | Solar Generation | |
Solar Generation |
Lancanster, CA | |
| $646 million Loan Amount | 20/350 Jobs (Permanent / Construction) | 250 Generation Capacity |
| 482,000 MWh/Gallons | 279,000 Annual Avoided CO2(tons) | 60,000 Annual Cars off the Road* |
| 42,700 Annual Households Equivalent | ||
| 1705 (FIPP) | ||
|---|---|---|
| Granite Reliable | Wind Generation | |
Wind Generation |
Coos County, NH | |
| $168.9 million Loan Amount | 6/198 Jobs (Permanent / Construction) | 99 Generation Capacity |
| 224,000 MWh/Gallons | 130,000 Annual Avoided CO2(tons) | 28,000 Annual Cars off the Road* |
| 19,900 Annual Households Equivalent | ||
| 1705 | ||
|---|---|---|
| Kahuku Wind Power (First Wind) | Wind Generation | |
Wind Generation |
Kahuku, Oahu, HI | |
| $117 million Loan Amount | 10/200 Jobs (Permanent / Construction) | 30 Generation Capacity |
| 68,000 MWh/Gallons | 39,000 Annual Avoided CO2(tons) | 8,000 Annual Cars off the Road* |
| 6,000 Annual Households Equivalent | ||
| 1705 | ||
|---|---|---|
| LS Power Associates (ON Line – formerly known as SWIP-S) | Transmission | |
Transmission |
Ely to Las Vegas, NV | |
| $343 million Loan Amount | 15/400 Jobs (Permanent / Construction) | N/A Generation Capacity |
| N/A MWh/Gallons | N/A Annual Avoided CO2(tons) | N/A Annual Cars off the Road* |
| N/A Annual Households Equivalent | ||
| 1705 | ||
|---|---|---|
| LS Power Associates (ON Line – formerly known as SWIP-S) | Transmission | |
Transmission |
Chesterfield, MO | |
| $343 million Loan Amount | 15/400 Jobs (Permanent / Construction) | N/A Generation Capacity |
| N/A MWh/Gallons | N/A Annual Avoided CO2(tons) | N/A Annual Cars off the Road* |
| N/A Annual Households Equivalent | ||
| 1705 | ||
|---|---|---|
| LS Power Associates (ON Line – formerly known as SWIP-S) | Transmission | |
Transmission |
Eastern Nevada, NV | |
| $343 million Loan Amount | 15/400 Jobs (Permanent / Construction) | N/A Generation Capacity |
| N/A MWh/Gallons | N/A Annual Avoided CO2(tons) | N/A Annual Cars off the Road* |
| N/A Annual Households Equivalent | ||
| 1705 | ||
|---|---|---|
| Mesquite Solar 1, LLC (Sempra Mesquite) | Solar Generation | |
Solar Generation |
Maricopa County, AZ | |
| $337 million Loan Amount | 7/300 Jobs (Permanent / Construction) | 170 Generation Capacity |
| 328,000 MWh/Gallons | 190,000 Annual Avoided CO2(tons) | 41,000 Annual Cars off the Road* |
| 29,100 Annual Households Equivalent | ||
| 1705 (FIPP) | ||
|---|---|---|
| Nevada Geothermal Power Company, Inc. (Blue Mountain) | Geothermal | |
Geothermal |
Reno, NV | |
| $98.5 million Loan Amount | 14/200 Jobs (Permanent / Construction) | 39 Generation Capacity |
| 290,000 MWh/Gallons | 168,000 Annual Avoided CO2(tons) | 36,000 Annual Cars off the Road* |
| 25,700 Annual Households Equivalent | ||
| 1705 (FIPP) | ||
|---|---|---|
| NextEra Energy Resources, LLC (Desert Sunlight) | Solar Generation | |
Solar Generation |
Riverside County, CA | |
| partial guarantee of $1.46 billion Loan Amount | 15/550 Jobs (Permanent / Construction) | 550 Generation Capacity |
| 1,060,000 MWh/Gallons | 614,000 Annual Avoided CO2(tons) | 131,000 Annual Cars off the Road* |
| 94,000 Annual Households Equivalent | ||
| 1705 (FIPP) | ||
|---|---|---|
| NextEra Energy Resources, LLC (Genesis Solar) | Solar Generation | |
Solar Generation |
Riverside County, CA | |
| partial guarantee of $852 million Loan Amount | 47/800 Jobs (Permanent / Construction) | 250 Generation Capacity |
| 679,000 MWh/Gallons | 393,000 Annual Avoided CO2(tons) | 84,000 Annual Cars off the Road* |
| 60,200 Annual Households Equivalent | ||
| 1705 | ||
|---|---|---|
| NRG Energy, Inc. (BrightSource) | Solar Generation | |
Solar Generation |
Mojave, CA | |
| $1.6 billion Loan Amount | 86/1,000 Jobs (Permanent / Construction) | 392 Generation Capacity |
| 1,065,000 MWh/Gallons | 617,000 Annual Avoided CO2(tons) | 132,000 Annual Cars off the Road* |
| 94,400 Annual Households Equivalent | ||
| 1705 | ||
|---|---|---|
| NRG Solar (California Valley Solar Ranch) | Solar Generation | |
Solar Generation |
San Luis Obispo, CA | |
| $1.237 billion Loan Amount | 15/350 Jobs (Permanent / Construction) | 250 Generation Capacity |
| 482,000 MWh/Gallons | 279,000 Annual Avoided CO2(tons) | 60,000 Annual Cars off the Road* |
| 42,700 Annual Households Equivalent | ||
| 1705 | ||
|---|---|---|
| NRG Solar, LLC (Agua Caliente) | Solar Generation | |
Solar Generation |
Yuma County, AZ | |
| $967 million Loan Amount | 10/400 Jobs (Permanent / Construction) | 290 Generation Capacity |
| 559,000 MWh/Gallons | 324,000 Annual Avoided CO2(tons) | 69,000 Annual Cars off the Road* |
| 49,600 Annual Households Equivalent | ||
| 1705 (FIPP) | ||
|---|---|---|
| Ormat Nevada, Inc. | Geothermal | |
Geothermal |
Jersey Valley, McGinness Hills, and Tuscarora, NV | |
| $350 million Loan Amount | 64/332 Jobs (Permanent / Construction) | 113 Generation Capacity |
| 841,000 MWh/Gallons | 487,000 Annual Avoided CO2(tons) | 104,000 Annual Cars off the Road* |
| 74,600 Annual Households Equivalent | ||
| 1705 (FIPP) | ||
|---|---|---|
| Prologis (Project Amp) | Solar Generation | |
Solar Generation |
28 States | |
| partial guarantee of $1.4 billion Loan Amount | 42/over 1,000 Jobs (Permanent / Construction) | 750 Generation Capacity |
| 1,445,000 MWh/Gallons | 837,000 Annual Avoided CO2(tons) | 179,000 Annual Cars off the Road* |
| 128,100 Annual Households Equivalent | ||
| 1705 (FIPP) | ||
|---|---|---|
| Prologis (Project Amp) | Solar Generation | |
Solar Generation |
New York | |
| partial guarantee of $1.4 billion Loan Amount | 42/over 1,000 Jobs (Permanent / Construction) | 750 Generation Capacity |
| 1,445,000 MWh/Gallons | 837,000 Annual Avoided CO2(tons) | 179,000 Annual Cars off the Road* |
| 128,100 Annual Households Equivalent | ||
| 1705 (FIPP) | ||
|---|---|---|
| Prologis (Project Amp) | Solar Generation | |
Solar Generation |
New Jersey | |
| partial guarantee of $1.4 billion Loan Amount | 42/over 1,000 Jobs (Permanent / Construction) | 750 Generation Capacity |
| 1,445,000 MWh/Gallons | 837,000 Annual Avoided CO2(tons) | 179,000 Annual Cars off the Road* |
| 128,100 Annual Households Equivalent | ||
| 1705 (FIPP) | ||
|---|---|---|
| Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Pennsylvania | |
| partial guarantee of $1.4 billion Loan Amount | 42/over 1,000 Jobs (Permanent / Construction) | 750 Generation Capacity |
| 1,445,000 MWh/Gallons | 837,000 Annual Avoided CO2(tons) | 179,000 Annual Cars off the Road* |
| 128,100 Annual Households Equivalent | ||
| 1705 (FIPP) | ||
|---|---|---|
| Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Virginia | |
| partial guarantee of $1.4 billion Loan Amount | 42/over 1,000 Jobs (Permanent / Construction) | 750 Generation Capacity |
| 1,445,000 MWh/Gallons | 837,000 Annual Avoided CO2(tons) | 179,000 Annual Cars off the Road* |
| 128,100 Annual Households Equivalent | ||
| 1705 (FIPP) | ||
|---|---|---|
| Prologis (Project Amp) | Solar Generation | |
Solar Generation |
North Carolina | |
| partial guarantee of $1.4 billion Loan Amount | 42/over 1,000 Jobs (Permanent / Construction) | 750 Generation Capacity |
| 1,445,000 MWh/Gallons | 837,000 Annual Avoided CO2(tons) | 179,000 Annual Cars off the Road* |
| 128,100 Annual Households Equivalent | ||
| 1705 (FIPP) | ||
|---|---|---|
| Prologis (Project Amp) | Solar Generation | |
Solar Generation |
South Carolina | |
| partial guarantee of $1.4 billion Loan Amount | 42/over 1,000 Jobs (Permanent / Construction) | 750 Generation Capacity |
| 1,445,000 MWh/Gallons | 837,000 Annual Avoided CO2(tons) | 179,000 Annual Cars off the Road* |
| 128,100 Annual Households Equivalent | ||
| 1705 (FIPP) | ||
|---|---|---|
| Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Georgia | |
| partial guarantee of $1.4 billion Loan Amount | 42/over 1,000 Jobs (Permanent / Construction) | 750 Generation Capacity |
| 1,445,000 MWh/Gallons | 837,000 Annual Avoided CO2(tons) | 179,000 Annual Cars off the Road* |
| 128,100 Annual Households Equivalent | ||
| 1705 (FIPP) | ||
|---|---|---|
| Prologis (Project Amp) | Solar Generation | |
Solar Generation |
28 States | |
| partial guarantee of $1.4 billion Loan Amount | 42/over 1,000 Jobs (Permanent / Construction) | 750 Generation Capacity |
| 1,445,000 MWh/Gallons | 837,000 Annual Avoided CO2(tons) | 179,000 Annual Cars off the Road* |
| 128,100 Annual Households Equivalent | ||
| 1705 (FIPP) | ||
|---|---|---|
| Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Tennessee | |
| partial guarantee of $1.4 billion Loan Amount | 42/over 1,000 Jobs (Permanent / Construction) | 750 Generation Capacity |
| 1,445,000 MWh/Gallons | 837,000 Annual Avoided CO2(tons) | 179,000 Annual Cars off the Road* |
| 128,100 Annual Households Equivalent | ||
| 1705 (FIPP) | ||
|---|---|---|
| Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Kentucky | |
| partial guarantee of $1.4 billion Loan Amount | 42/over 1,000 Jobs (Permanent / Construction) | 750 Generation Capacity |
| 1,445,000 MWh/Gallons | 837,000 Annual Avoided CO2(tons) | 179,000 Annual Cars off the Road* |
| 128,100 Annual Households Equivalent | ||
| 1705 (FIPP) | ||
|---|---|---|
| Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Ohio | |
| partial guarantee of $1.4 billion Loan Amount | 42/over 1,000 Jobs (Permanent / Construction) | 750 Generation Capacity |
| 1,445,000 MWh/Gallons | 837,000 Annual Avoided CO2(tons) | 179,000 Annual Cars off the Road* |
| 128,100 Annual Households Equivalent | ||
| 1705 (FIPP) | ||
|---|---|---|
| Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Illinois | |
| partial guarantee of $1.4 billion Loan Amount | 42/over 1,000 Jobs (Permanent / Construction) | 750 Generation Capacity |
| 1,445,000 MWh/Gallons | 837,000 Annual Avoided CO2(tons) | 179,000 Annual Cars off the Road* |
| 128,100 Annual Households Equivalent | ||
| 1705 (FIPP) | ||
|---|---|---|
| Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Wisconsin | |
| partial guarantee of $1.4 billion Loan Amount | 42/over 1,000 Jobs (Permanent / Construction) | 750 Generation Capacity |
| 1,445,000 MWh/Gallons | 837,000 Annual Avoided CO2(tons) | 179,000 Annual Cars off the Road* |
| 128,100 Annual Households Equivalent | ||
| 1705 (FIPP) | ||
|---|---|---|
| Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Mississippi | |
| partial guarantee of $1.4 billion Loan Amount | 42/over 1,000 Jobs (Permanent / Construction) | 750 Generation Capacity |
| 1,445,000 MWh/Gallons | 837,000 Annual Avoided CO2(tons) | 179,000 Annual Cars off the Road* |
| 128,100 Annual Households Equivalent | ||
| 1705 (FIPP) | ||
|---|---|---|
| Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Louisiana | |
| partial guarantee of $1.4 billion Loan Amount | 42/over 1,000 Jobs (Permanent / Construction) | 750 Generation Capacity |
| 1,445,000 MWh/Gallons | 837,000 Annual Avoided CO2(tons) | 179,000 Annual Cars off the Road* |
| 128,100 Annual Households Equivalent | ||
| 1705 (FIPP) | ||
|---|---|---|
| Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Oregon | |
| partial guarantee of $1.4 billion Loan Amount | 42/over 1,000 Jobs (Permanent / Construction) | 750 Generation Capacity |
| 1,445,000 MWh/Gallons | 837,000 Annual Avoided CO2(tons) | 179,000 Annual Cars off the Road* |
| 128,100 Annual Households Equivalent | ||
| 1705 (FIPP) | ||
|---|---|---|
| Prologis (Project Amp) | Solar Generation | |
Solar Generation |
28 States | |
| partial guarantee of $1.4 billion Loan Amount | 42/over 1,000 Jobs (Permanent / Construction) | 750 Generation Capacity |
| 1,445,000 MWh/Gallons | 837,000 Annual Avoided CO2(tons) | 179,000 Annual Cars off the Road* |
| 128,100 Annual Households Equivalent | ||
| 1705 (FIPP) | ||
|---|---|---|
| Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Minnesota | |
| partial guarantee of $1.4 billion Loan Amount | 42/over 1,000 Jobs (Permanent / Construction) | 750 Generation Capacity |
| 1,445,000 MWh/Gallons | 837,000 Annual Avoided CO2(tons) | 179,000 Annual Cars off the Road* |
| 128,100 Annual Households Equivalent | ||
| 1705 (FIPP) | ||
|---|---|---|
| Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Texas | |
| partial guarantee of $1.4 billion Loan Amount | 42/over 1,000 Jobs (Permanent / Construction) | 750 Generation Capacity |
| 1,445,000 MWh/Gallons | 837,000 Annual Avoided CO2(tons) | 179,000 Annual Cars off the Road* |
| 128,100 Annual Households Equivalent | ||
| 1705 (FIPP) | ||
|---|---|---|
| Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Utah | |
| partial guarantee of $1.4 billion Loan Amount | 42/over 1,000 Jobs (Permanent / Construction) | 750 Generation Capacity |
| 1,445,000 MWh/Gallons | 837,000 Annual Avoided CO2(tons) | 179,000 Annual Cars off the Road* |
| 128,100 Annual Households Equivalent | ||
| 1705 (FIPP) | ||
|---|---|---|
| Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Arizona | |
| partial guarantee of $1.4 billion Loan Amount | 42/over 1,000 Jobs (Permanent / Construction) | 750 Generation Capacity |
| 1,445,000 MWh/Gallons | 837,000 Annual Avoided CO2(tons) | 179,000 Annual Cars off the Road* |
| 128,100 Annual Households Equivalent | ||
| 1705 (FIPP) | ||
|---|---|---|
| Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Nevada | |
| partial guarantee of $1.4 billion Loan Amount | 42/over 1,000 Jobs (Permanent / Construction) | 750 Generation Capacity |
| 1,445,000 MWh/Gallons | 837,000 Annual Avoided CO2(tons) | 179,000 Annual Cars off the Road* |
| 128,100 Annual Households Equivalent | ||
| 1705 (FIPP) | ||
|---|---|---|
| Prologis (Project Amp) | Solar Generation | |
Solar Generation |
California | |
| partial guarantee of $1.4 billion Loan Amount | 42/over 1,000 Jobs (Permanent / Construction) | 750 Generation Capacity |
| 1,445,000 MWh/Gallons | 837,000 Annual Avoided CO2(tons) | 179,000 Annual Cars off the Road* |
| 128,100 Annual Households Equivalent | ||
| 1705 (FIPP) | ||
|---|---|---|
| Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Washington | |
| partial guarantee of $1.4 billion Loan Amount | 42/over 1,000 Jobs (Permanent / Construction) | 750 Generation Capacity |
| 1,445,000 MWh/Gallons | 837,000 Annual Avoided CO2(tons) | 179,000 Annual Cars off the Road* |
| 128,100 Annual Households Equivalent | ||
| 1705 | ||
|---|---|---|
| Record Hill Wind | Wind Generation | |
Wind Generation |
Roxbury, ME | |
| $102 million Loan Amount | 8/200 Jobs (Permanent / Construction) | 50 Generation Capacity |
| 96,000 MWh/Gallons | 56,000 Annual Avoided CO2(tons) | 12,000 Annual Cars off the Road* |
| 8,500 Annual Households Equivalent | ||
| 1705 | ||
|---|---|---|
| SolarReserve, LLC (Crescent Dunes) | Solar Generation | |
Solar Generation |
Nye County, NV | |
| $737 million Loan Amount | 45/600 Jobs (Permanent / Construction) | 110 Generation Capacity |
| 482,000 MWh/Gallons | 279,000 Annual Avoided CO2(tons) | 60,000 Annual Cars off the Road* |
| 42,700 Annual Households Equivalent | ||
| 1705 | ||
|---|---|---|
| SoloPower | Solar Manufacturing | |
Solar Manufacturing |
Portland, OR | |
| $197 million Loan Amount | 450/270 Jobs (Permanent / Construction) | 400 Generation Capacity |
| 771,000 MWh/Gallons | 446,000 Annual Avoided CO2(tons) | 95,000 Annual Cars off the Road* |
| 68,400 Annual Households Equivalent | ||
| 1705 | ||
|---|---|---|
| Solyndra Inc. | Solar Manufacturing | |
Solar Manufacturing |
Fremont, CA | |
| $535 million Loan Amount | N/A/3,000 Jobs (Permanent / Construction) | N/A Generation Capacity |
| 681,000 MWh/Gallons | 391,000 Annual Avoided CO2(tons) | 75,000 Annual Cars off the Road* |
| 59,000 Annual Households Equivalent | ||
| 1705 | ||
|---|---|---|
| Stephentown Spindle (Beacon Power) | Energy Storage | |
Energy Storage |
Stephentown, NY | |
| $43 million Loan Amount | 14/20 Jobs (Permanent / Construction) | N/A Generation Capacity |
| N/A MWh/Gallons | N/A Annual Avoided CO2(tons) | N/A Annual Cars off the Road* |
| N/A Annual Households Equivalent | ||
| 1705 | ||
|---|---|---|
| US Geothermal, Inc. | Geothermal | |
Geothermal |
Malheur County, OR | |
| $97 million Loan Amount | 10/150 Jobs (Permanent / Construction) | 20 Generation Capacity |
| 149,000 MWh/Gallons | 86,000 Annual Avoided CO2(tons) | 18,000 Annual Cars off the Road* |
| 13,200 Annual Households Equivalent | ||
| ATVM | ||
|---|---|---|
| Fisker Automotive | OEM | |
OEM |
Wilmington, DE | |
| $529 million Loan Amount | 300 Jobs (Permanent) | N/A Generation Capacity |
| N/A MWh/Gallons | 154,000 Annual Avoided CO2(tons) | 30,000 Annual Cars off the Road* |
| N/A Annual Households Equivalent | ||
| ATVM | ||
|---|---|---|
| Fisker Automotive | OEM | |
OEM |
Irvine, CA | |
| $529 million Loan Amount | 300 Jobs (Permanent) | N/A Generation Capacity |
| N/A MWh/Gallons | 154,000 Annual Avoided CO2(tons) | 30,000 Annual Cars off the Road* |
| N/A Annual Households Equivalent | ||
| ATVM | ||
|---|---|---|
| Ford Motor Company | Motor Vehicle Manufacturing | |
Motor Vehicle Manufacturing |
Michigan | |
| $5.907 billion Loan Amount | 33,000 Jobs (Permanent) | N/A Generation Capacity |
| N/A MWh/Gallons | 2,380,000 Annual Avoided CO2(tons) | 509,000 Annual Cars off the Road* |
| N/A Annual Households Equivalent | ||
| ATVM | ||
|---|---|---|
| Ford Motor Company | Motor Vehicle Manufacturing | |
Motor Vehicle Manufacturing |
Illinois | |
| $5.907 billion Loan Amount | 3,000 Jobs (Permanent) | N/A Generation Capacity |
| N/A MWh/Gallons | 2,380,000 Annual Avoided CO2(tons) | 509,000 Annual Cars off the Road* |
| N/A Annual Households Equivalent | ||
| ATVM | ||
|---|---|---|
| Ford Motor Company | Motor Vehicle Manufacturing | |
Motor Vehicle Manufacturing |
Kentucky | |
| $5.907 billion Loan Amount | 3,500 Jobs (Permanent) | N/A Generation Capacity |
| N/A MWh/Gallons | 2,380,000 Annual Avoided CO2(tons) | 509,000 Annual Cars off the Road* |
| N/A Annual Households Equivalent | ||
| ATVM | ||
|---|---|---|
| Ford Motor Company | Motor Vehicle Manufacturing | |
Motor Vehicle Manufacturing |
Missouri | |
| $5.907 billion Loan Amount | 4,000 Jobs (Permanent) | N/A Generation Capacity |
| N/A MWh/Gallons | 2,380,000 Annual Avoided CO2(tons) | 509,000 Annual Cars off the Road* |
| N/A Annual Households Equivalent | ||
| ATVM | ||
|---|---|---|
| Nissan North America, Inc. | OEM | |
OEM |
Smyrna, TN | |
| $1.448 billion Loan Amount | 1,300 Jobs (Permanent) | N/A Generation Capacity |
| N/A MWh/Gallons | 51,000 Annual Avoided CO2(tons) | 11,000 Annual Cars off the Road* |
| N/A Annual Households Equivalent | ||
| ATVM | ||
|---|---|---|
| Tesla Motors | OEM | |
OEM |
Fremont, CA | |
| $465 million Loan Amount | 1,500 Jobs (Permanent) | N/A Generation Capacity |
| N/A MWh/Gallons | 52,000 Annual Avoided CO2(tons) | 11,000 Annual Cars off the Road* |
| N/A Annual Households Equivalent | ||
| ATVM | ||
|---|---|---|
| The Vehicle Production Group LLC | OEM | |
OEM |
Mishawaka, IN | |
| $50 million Loan Amount | 900 Jobs (Permanent) | N/A Generation Capacity |
| N/A MWh/Gallons | 12,200 Annual Avoided CO2(tons) | 3,000 Annual Cars off the Road* |
| N/A Annual Households Equivalent | ||
| ATVM | ||
|---|---|---|
| The Vehicle Production Group LLC | OEM | |
OEM |
Mishawaka, IN | |
| $50 million Loan Amount | 900 Jobs (Permanent) | N/A Generation Capacity |
| N/A MWh/Gallons | 12,200 Annual Avoided CO2(tons) | 3,000 Annual Cars off the Road* |
| N/A Annual Households Equivalent | ||
Annual MWh/Gallon:
Annual generation of electricity in megawatt-hours (MWh) or gallons of biofuel (project type dependent).
20-year avoided GHG:
Tons of greenhouse gases that might have otherwise been emitted from other energy sources over a 20-year period if not for implementation of the project.
Annual avoided CO2:
Annual tons of carbon dioxide that might have otherwise been emitted from other energy sources if not for implementation of the project.
Annual avoided SO2:
Annual tons of sulfur dioxide that might have otherwise been emitted from other energy sources if not for implementation of the project.
Annual avoided NOx:
Annual tons of nitrogen oxides that might have otherwise been emitted from other energy sources if not for implementation of the project.
Annual “cars off the road”:
The number of passenger vehicles with equivalent annual tons of greenhouse gases emissions that might have otherwise occurred from other energy sources if not for implementation of the project (as based on EPA MOBILE6.2 Average passenger vehicle = 5.20 metric tons CO2e).
Household equivalents:
The number of residential households with equivalent annual tons of carbon dioxide emissions that might have otherwise occurred from other energy sources if not for implementation of the project (as based on EIA figure 14,796 lbs CO2 emissions per year for an average household).
| Program | Technology | Date of Agreement | Status | Jobs (Permanent/ Construction) |
Locations | Loan Guarantee Amount |
|---|---|---|---|---|---|---|
| 1703 | ||||||
| AREVA | Front-end Nuclear | 5/2010 | Conditional Commitment | 310/1,000 | Idaho Falls, ID | $2 billion |
| Georgia Power Company | Nuclear Generation | 2/2010 | Conditional Commitment | 800/3,500 | Waynesboro, GA | $8.33 billion |
| Program | Technology | Date of Agreement | Status | Jobs (Permanent/ Construction) |
Locations | Loan Guarantee Amount |
|---|---|---|---|---|---|---|
| 1705 | ||||||
| 1366 Technologies, Inc. | Solar Manufacturing | 9/2011 | Closed | 70/50 | Lexington, MA | $150 million |
| Abengoa Bioenergy Biomass of Kansas LLC | Biofuel | 8/2011 | Closed | 65/300 | Hugoton, KS | $132.4 million |
| Abengoa Solar, Inc. (Mojave Solar) | Solar Generation | 6/2011 | Closed | 70/830 | San Bernardino County, CA | $1.2 billion |
| Abengoa Solar, Inc. (Solana) | Solar Generation | 12/2010 | Closed | 60/1,700 | Gila Bend, AZ | $1.446 billion |
| Abound Solar | Solar Manufacturing | 12/2010 | Closed | N/A/400 | Longmont, CO and Tipton, IN | $400 million |
Caithness Shepherds Flat
|
Wind Generation | 10/2010 | Closed | 35/400 | Gilliam, Morrow Counties, OR | $1.3 billion |
Cogentrix of Alamosa, LLC
|
Solar Generation | 9/2011 | Closed | 10/75 | Alamosa, CO | $90 milion |
| Exelon (Antelope Valley Solar Ranch) | Solar Generation | 9/2011 | Closed | 20/350 | Lancanster, CA | $646 million |
Granite Reliable
|
Wind Generation | 9/2011 | Closed | 6/198 | Coos County, NH | $168.9 million |
Kahuku Wind Power (First Wind)
|
Wind Generation | 3/2010 | Closed | 10/200 | Kahuku, Oahu, HI | $117 million |
| LS Power Associates (ON Line – formerly known as SWIP-S) | Transmission | 2/2011 | Closed | 15/400 | Ely to Las Vegas, NV | $343 million |
Mesquite Solar 1, LLC (Sempra Mesquite)
|
Solar Generation | 9/2011 | Closed | 7/300 | Maricopa County, AZ | $337 million |
Nevada Geothermal Power Company, Inc. (Blue Mountain)
|
Geothermal | 9/2011 | Closed | 14/200 | Humbolt County, NV | $98.5 million |
| NextEra Energy Resources, LLC (Desert Sunlight) | Solar Generation | 9/2011 | Closed | 15/550 | Riverside County, CA | partial guarantee of $1.46 billion |
| NextEra Energy Resources, LLC (Genesis Solar) | Solar Generation | 6/2011 | Closed | 47/800 | Riverside County, CA | partial guarantee of $852 million |
| NRG Energy, Inc. (BrightSource) | Solar Generation | 4/2011 | Closed | 86/1,000 | Baker, CA | $1.6 billion |
NRG Solar (California Valley Solar Ranch)
|
Solar Generation | 9/2011 | Closed | 15/350 | San Luis Obispo, CA | $1.237 billion |
NRG Solar, LLC (Agua Caliente)
|
Solar Generation | 8/2011 | Closed | 10/400 | Yuma County, AZ | $967 million |
Ormat Nevada, Inc.
|
Geothermal | 6/2011 | Closed | 64/332 | Jersey Valley, McGinness Hills, and Tuscarora, NV | $350 million |
| Prologis (Project Amp) | Solar Generation | 6/2011 | Closed | 42/over 1,000 | 28 States | partial guarantee of $1.4 billion |
Record Hill Wind
|
Wind Generation | 8/2011 | Closed | 8/200 | Roxbury, ME | $102 million |
| SolarReserve, LLC (Crescent Dunes) | Solar Generation | 6/2011 | Closed | 45/600 | Nye County, NV | $737 million |
| SoloPower | Solar Manufacturing | 8/2011 | Closed | 450/270 | Portland, OR | $197 million |
| Solyndra Inc. | Solar Manufacturing | 9/2009 | Closed | N/A/3,000 | Fremont, CA | $535 million |
| Stephentown Spindle (Beacon Power) | Energy Storage | 8/2010 | Closed | 14/20 | Stephentown, NY | $43 million |
US Geothermal, Inc.
|
Geothermal | 2/2011 | Closed | 10/150 | Malheur County, OR | $97 million |
| Program | Date | Status | Jobs (created/ saved) |
Number of Projects |
Loan Amount |
|---|---|---|---|---|---|
| ATVM | |||||
| Fisker Automotive | 4/2010 | Closed | 300 | 2 | $529 million |
| Ford Motor Company | 9/2009 | Closed | 33,000 | 13 | $5.907 billion |
| Nissan North America, Inc. | 1/2010 | Closed | 1,300 | 2 | $1.448 billion |
| Tesla Motors | 1/2010 | Closed | 1,500 | 2 | $465 million |
| The Vehicle Production Group LLC | 3/2011 | Closed | 900 | 1 | $50 million |